Carte Resource-Constrained Project Scheduling Arno Sprecher

Resource-Constrained Project Scheduling

Exact Methodes for the Multi-Mode Case

Autor: Arno Sprecher
Limbă: engleză
Legare: Carte broșată
Disponibilitate: În depozitul extern
Expediem în 5-8 zile
551.94 lei
The subject of the book is project scheduling under resource-constraints. Several well-known schedul...

Informații despre carte

Limbă
engleză
Legare
Carte - Carte broșată
Publicat
1994
Pagini
142
EAN
9783540578345
ISBN
354057834X
Enbook ID
06809130
Greutate
260
Dimensiuni
155 x 235 x 10

Descriere completă

The subject of the book is project scheduling under resource-constraints. Several well-known scheduling problems, like e.g. the job-shop-scheduling and the assembly line balancing problem, are embedded in the mathematical programming formulation used. Exact solution procedures for a broad class of performance measures, i.e. objectives, are presented. Moreover, an algorithm for the generation of problem instances (ProGen) is described. The newcomer is introduced by illustrative examples into the field of scheduling and the expert is familarized with a powerful exact solution procedure for the multi-mode resource-constrained project scheduling problem. For the more general readership the main ideas of problem generation and computational tractability are of interest.

S-ar putea să te intereseze

551.94 lei
29.65 lei
396.27 lei

Chinese Civil War

Michael Lynch
82.52 lei
1 102.18 lei
270.37 lei

The Son of Summer Stars

Meredith Ann Pierce
37.62 lei
69.50 lei
112.78 lei

Art of Digital Audio

John Watkinson
1 701.75 lei

Mystery Box

MCALPINE GORDO
80.29 lei
283.58 lei
748.17 lei

Sarcoidosis

J. G. Scadding
276.72 lei

Anna Letitia Barbauld

William Mccarthy
785.09 lei
287.82 lei

Clienții care au cumpărat această carte au mai cumpărat și

122.46 lei

Myší bál

Josef Kožíšek
11.80 lei
270.97 lei