Carte Project Management with Dynamic Scheduling Mario Vanhoucke

Project Management with Dynamic Scheduling

Baseline Scheduling, Risk Analysis and Project Control

Limbă: engleză
Legare: Copertă tare
Disponibilitate: În depozitul extern
Expediem în 10-13 zile
1 213.03 lei
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of p...

Informații despre carte

Limbă
engleză
Legare
Carte - Copertă tare
Publicat
2013
Pagini
318
EAN
9783642404375
ISBN
3642404375
Enbook ID
02007051
Greutate
658
Dimensiuni
164 x 250 x 25

Descriere completă

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. §In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Leuven Gent Management School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project s time and cost reserves.§The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".§

S-ar putea să te intereseze

Portuguese Studies 31

Claudia Pazos Alonso
209.36 lei
187.05 lei

Papers by Command, Volume 8

Great Britain Parliament House of Comm
229.35 lei
100.44 lei
63.09 lei

For the Defence

Fergus Hume
119.22 lei

Alarmstart East

Patrick G. Eriksson
125.27 lei

Auntie's War

Edward Stourton
92.26 lei

A Haunt for Jackals

Benjamin Westbrook
69.75 lei

Clienții care au cumpărat această carte au mai cumpărat și

Rozpletení uzlu

Meghan Quinn
83.08 lei
355.04 lei

Philosoph fur die Welt

Engel Johann Jakob Engel
134.76 lei

Wollust

Clay F. Cassidy
39.77 lei
430.96 lei

Die Ursachen der Teuerung.

Eduard Wilhelm Sand
101.95 lei
164.85 lei
132.64 lei