Carte Capacitated Lot Sizing Problems in Process Industries Ravi Ramya

Capacitated Lot Sizing Problems in Process Industries

Limbă: engleză
Legare: Copertă tare
Disponibilitate: În depozitul extern
Expediem în 10-13 zile
276.90 lei
This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all pr...

Informații despre carte

Limbă
engleză
Legare
Carte - Copertă tare
Publicat
2019
Pagini
196
EAN
9783030012212
Enbook ID
20124366
Greutate
888
Dimensiuni
210 x 279 x 286

Descriere completă

This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC). These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries.

S-ar putea să te intereseze

The sword of wealth

Henry Wilton Thomas
80.05 lei

Sabastian Vettel; Genius or Joker

Silverbrain Publications
36.74 lei
607.72 lei

Glorious Flowers Coloring Book

Pierre-Joseph Redouté
64.50 lei

Diamond

Jessie Keane
54.40 lei
827.70 lei

Art of Mindfulness

Emma Farrarons
70.66 lei

Chitral Campaign

H C Thomson
92.87 lei

Alex and the Hobo

James Taggart
158.49 lei
1 009.31 lei
75.70 lei
97.81 lei

War Comes to Garmser

Carter Malkasian
132.84 lei

Ride Home

Pamela Howell
160.81 lei
193.21 lei

Energy Island

Allan Drummond
45.62 lei

Aerodrome

Rex Warner
140.41 lei

Clienții care au cumpărat această carte au mai cumpărat și

326.07 lei
187.26 lei
86.81 lei

Adelaide

Genevieve Wheeler
53.60 lei

La Galatea

Miguel de Cervantes
71.46 lei
99.23 lei
96.10 lei
66.62 lei

AGAMENÓN

YANNIS RITSOS
72.98 lei

ERP-System bei Cisco

Florian Schaub
87.01 lei